Overview
Distribution-Ready from the Ground Up
WoodStone Earth delivered complete site development for a FedEx warehouse and distribution facility. The project demanded heavy-duty infrastructure capable of supporting large-scale logistics operations — from mass earthwork and stormwater management to underground utilities and industrial-grade pavement designed for constant heavy truck traffic.
Mass Earthwork
Excavate and grade the building pad, truck courts, and stormwater management areas for a large distribution facility.
Stormwater Systems
Install retention ponds, bio-filtration systems, and a complete storm drainage network to manage runoff across the site.
Utilities & Paving
Complete all underground services and heavy-duty concrete and asphalt pavement engineered for distribution operations.